Kulamoto Technical Training Institute (KTTI) is a specialized technical institution located in Bungoma County, Kimilili Sub-County. The institute offers technical courses only, with a strong focus on practical, hands-on training aimed at producing skilled, competent, and industry-ready graduates.
The institute is committed to equipping learners with relevant technical skills that promote employment, self-reliance, and innovation. Through workshop-based learning and modern training methods, Kulamoto Technical Training Institute prepares students to meet the demands of the evolving technical and vocational sector.
Courses Offered
Kulamoto Technical Training Institute offers technical courses only, including:
Electrical Installation and Wiring
Motor Vehicle Mechanics
Welding and Fabrication
Plumbing and Pipe Fitting
Building Construction Technology
Carpentry and Joinery
Electrical and Electronics Technology
Mechatronics (Basic Level)Industrial Machining / Fitting and Turning
Solar Installation and Maintenance
Refrigeration and Air Conditioning
Information and Communication Technology (ICT – Technical Track)
This unit specifies the competencies required to Conduct Material Testing I. It involves performing tests on alignment soils, concrete. ELEMENTS AND PERFORMANCE CRITERIA ELEMENT These describe the key outcomes which make up workplace function LEARNING OUTCOMES These are assessable statements, which specify the required level of performance for each of the elements. (Bold and italicized terms are elaborated in the Range) 1. Perform soil tests
2.Soil tests are identified according to contract document 3.Standard manuals, procedures and PPEs are obtained in accordance with test requirement 4. Soil testing tools and apparatus are assembled based on test requirements 5. Soil samples are obtained according to test requirement 6. Soil tests are conducted and materials handled as per the laboratory manual, ensuring minimal waste generation, safe disposal of test residues, and adherence to eco-friendly testing procedures. 7. Results are analyzed as per the soil analysis manual 8. Digitalised report is prepared and presented based on contract document requirement 9. Testing equipment are maintained as per the manufacturer’s instructions and environmental regulations. 10.Perform concrete tests
11.Concrete tests are identified according to contract document 12. Concrete testing tools and apparatus are gathered based on test requirements 13. Concrete materials are tested as per test requirement
This unit describes the competencies required in carrying out site surveys. It involves undertaking preliminary site surveys, setting out civil structures and establishing survey control points. ELEMENTS AND PERFORMANCE CRITERIA ELEMENT These describe the key outcomes which make up workplace function PERFORMANCE CRITERIA These are assessable statements which specify the required level of performance for each of the elements (Bold and italicized terms are elaborated in the Range) 1. Undertake preliminary site survey 1.1 Preliminary site survey plan is prepared in as per job requirement 1.2 Survey resources are mobilized as per the contract document 1.3 Working drawings are interpreted as per job requirement 1.4 Site conditions are recorded as per job requirement procedures 1.5 Original ground level (OGL) is established and documented as per job requirement 1.6 Reference points are established as per job requirement sustainable practices in establishing reference points 1.7 . 1.8 Preliminary survey report is prepared by use of mobile devices or tablets for on-site data entry according to findings.
This unit describes the competencies required in carry out pavement construction works. It involves Carrying out Earthwork Activities, constructing pavement layers, constructing transportation infrastructure and applying emerging trends in road construction LERANING OUTCOMES These describe the key outcomes which make up workplace function Performance criteria These are assessable statements which specify the required level of performance for each of the elements (Bold and italicized terms are elaborated in the Range) Carry out earthwork activities
1.1 Earthwork resources are mobilized as per the work requirement and NEMA regulations 1.2 Site clearance activities are carried out based on job requirement with conservation measures 1.3 Drawings are interpreted as per site layout 1.4 Setting out for earthworks is conducted based on design output and green space requirement 1.5 Ground levels are documented according to site level reports 1.6 Volumes of cut and fill materials is determined in accordance to the ground levels with environmental conservation measures 1.7 Disposal of waste material is carried out as per the waste disposal regulations 1.8 Construction tools and equipment are operated and maintained as per the manufacturer’s instruction